Clock IoT Connector Type A - User Manual

Modified on: Tue, 20 Feb, 2024 at 7:44 AM

Print

Hello and welcome!

To be on this page means you have received the Clock IoT connector and need to install it. The purpose of the IoT device is to act as a communication bridge between Clock PMS+ cloud servers and local servers or third-party devices - these are access control systems (key cards); non-fiscal printers; fiscal printers and others.

Please note that one IoT device can communicate with multiple systems - for example, if you have a key-card system and a payment terminal, you only need 1 IoT device to communicate with both (as long as the requirements described below are met).

To achieve seamless and uninterrupted communication, you must strictly follow the instructions described here, especially those related to your local network settings.

Product Description

In the product package, you will find:

  • Clock IoT device, based on the A20-OLinuXino-LIME2 mini PC;
  • Power supply adapter;
  • Network cable;
  • SD card, inserted in the device.

Front side

  • 1 - power supply port;
  • 2 and 3 - USB ports;
  • - network connection indicator;
  • 5 - network data transfer indicator;
  • - LAN port;
  • - battery connector;

Back side

  • 8 - switch on/off;
  • - hardware restart (not recommended);
  • 10 - not used;
  • 11 - SD card port
  • 12 - USB OTG - not used;
  • 13 - HDMI port - for monitor connection;
  • 14 - SATA port - not used;
  • 15 - not used;

Operation instruction

Switching on the device

  • Plug the power supply adapter in port 1. Make sure that the power supply works by checking if a red light comes from port 1
  • Wait between 1 and 5 minutes for the OS of the device to load. The device is ready for work after the loading of the operating system. You can check this from the side ventilation opening near the network port. If the operating system is loaded, you will see a green LED light. The LED cannot be seen directly, therefore the light coming through the opening is fable.
  • Plug the network cable in port 6.  Make sure there is network activity by checking the lights of the LEDS of ports  (and 5).

Switching off the device

Press button 8, and hold it for more than 5 seconds until the green light through the side ventilation opening stops. Then you can switch off the device by unplugging the power supply cable.

Important: You CANNOT switch off the device directly by unplugging the power supply cable, as the Clock IoT device has a built-in battery. In case of a voltage drop, the device can work for about two more hours (depending on the battery charge). 

Restart

  • Press button 8 and hold it for more than 5 seconds. After the lights stop, press the same button for 5 more seconds. 
  • For a hardware restart, hold button down for about 2 seconds. Please perform a hardware restart of the device, only if upon recommendation from the Clock PMS+ support team.

Work Safety

  • Avoid leaving the Clock IoT without a power supply for long periods;
  • Always switch off the device in the instructed manner;
  • Perform a restart only if necessary.

Troubleshooting

If you have performed all steps to switch on the device and you do not see a green light coming from the side opening after waiting for it for some time as described above, press button 8  down for more than 5 seconds. Wait for some time needed by the OS to load.